RICS Level 3 Building Survey

The most thorough RICS survey, for older, extended or unusual homes across London and the South East.

£525

Fee from

5 to 7

Days to report

4.8★

110+ reviews

RICS Regulated FirmRegulated firm

The answers you were about to ask for

You can compare us straight away.

  1. 1Fee, on screen.Type your property value into the form. The number you see is the full price, the final total you pay.
  2. 2Estimated cost of repairs included as standard.Where applicable, at no extra cost, so you have figures to negotiate with. A valuation can be added on request.
  3. 3Earliest inspection date offered immediately.We arrange access with the agent or vendor. You do not need to coordinate anything.
  4. 4Report date confirmed at booking.5 to 7 working days from inspection. You know the date before you pay.
  5. 5A written inspection summary, usually within 24 hours of the visit.Plus a call with our surveying team once you have read the full report.
  6. 6RICS Regulated Firm 816557.MRICS surveyors. Registered Valuer on every valuation.
  7. 7Sample reports, shown in your quote.Real and local reports conducted by our team, so you see what you get before you commit.
  8. 8Your own interactive portal.One link with your quote, sample reports, inspection date, terms, payment, live booking status and the report the moment it is ready.
  9. 9Aftercare, after the report.What the defects mean, what to fix first and what it should cost, through offeraccepted.co.uk.
  10. 10Pay on booking, card or bank transfer.Klarna and Clearpay available through Stripe checkout if you would rather spread it.

Step 1 of 2 · Your property

Your fee

Enter the property value and your fee appears here, before we ask for any contact details.

No obligation · Fee shown before we ask for your details

What you receive

What's included

✓

Full structural inspection

Every accessible part of the structure inspected: foundations, walls, roof structure, floors, and all major elements.

✓

Defect severity ratings

Each defect categorised by urgency: Condition 1 (satisfactory), 2 (repairs needed), 3 (urgent attention required).

✓

Cause and remediation advice

Not just what is wrong, but why it has occurred and the recommended course of action, with options where applicable.

✓

Indicative repair costs

Estimated cost ranges for significant defects, giving you a basis for negotiation or budget planning.

✓

Hidden defects identified

Damp, rot, subsidence, structural movement, and other concealed problems that a visual inspection alone would miss.

✓

Services and drainage overview

Summary of all services including gas, electricity, water, and drainage, with recommendations for specialist investigation where needed.

You need a Level 3 if…

  • ✓The property was built before 1950
  • ✓It is listed or of non-standard construction
  • ✓There are visible cracks, damp, or signs of movement
  • ✓The property has been extended or significantly altered
  • ✓It has a flat roof, basement, or complex drainage
  • ✓You want the most comprehensive inspection available

See the detail

Download a sample report

See the depth and layout of a completed Level 3 Building Survey, including defect photography, condition ratings, and cost guidance.

Download sample PDF

Choosing a survey

Level 2 or Level 3?

Consider Level 2 if…

  • →Built after 1950 in conventional construction
  • →In good, well-maintained condition
  • →No visible signs of movement or damp
  • →Standard house or flat, no major alterations
View Level 2 Homebuyer Survey →

Level 3 is right if… ✓

  • ✓Pre-1950 or non-standard construction
  • ✓Signs of cracks, damp, or movement
  • ✓Extended, converted, or significantly altered
  • ✓Listed building or unusual property type
  • ✓You want complete peace of mind

Common questions

Frequently asked questions

What does a Level 3 Building Survey cover?

A Level 3 Building Survey covers the full structure and fabric of the building, from foundations and roof structure to internal walls, floors, windows, and all services. Every accessible element is inspected and condition-rated. The report identifies defects, explains their cause, and advises on remediation options and likely costs.

How is a Level 3 different from a Level 2 Homebuyer Survey?

A Level 2 Homebuyer Survey uses a standardised RICS format with condition ratings. A Level 3 Building Survey goes further. It is a bespoke, narrative report tailored to the specific property, covering the construction type, identifying hidden defects, explaining causes, and providing cost guidance. It is significantly more detailed.

How much does a Building Survey cost?

Our fees start from £525 and scale with the property value and complexity. You receive a fixed-price quote upfront. No hidden fees. Get your quote using the form on this page.

How long does the inspection take?

A Building Survey inspection typically takes 4 to 8 hours depending on the size, age, and complexity of the property. Your full written report is delivered within 5 to 7 working days.

Can I attend the survey?

You're welcome to attend at the end of the inspection for a verbal summary. We arrange access directly with the estate agent or vendor. You don't need to coordinate anything.

Can I use the report to renegotiate the price?

Absolutely. And many buyers do. Where significant defects are identified, our indicative cost estimates give you a strong basis for renegotiation. Your solicitor can also use the report to raise enquiries with the vendor.

From £525 · Report in 5 to 7 working days

Ready to book your Building Survey?

Get a personalised quote in minutes. No obligation.

020 3900 3902

View a sample Building Survey report

See the level of detail included in a Surveyor Sorted Level 3 Building Survey. This redacted sample covers a mid-terrace property in East London. 82 pages including condition ratings, repair cost estimates, and photographic evidence.

PDF · 82 pages8.6 MB
View sample report